New LEXL builder and making ribs. Most are done, but 7, 12 and 13 yet to do. Using the Iron Design plans supplement. Looked through earlier posts but still unclear on a few things. Have the A1 doublers as shown on the Iron Design been eliminated/changed, or where do they go? What I have come up with is rib #7 has a 1/4" on root side and .8 mm on tip side. Rib #12 has 1/16" on root side and .8 mm on tip side. Not sure what is on rib #13. Can someone confirm and/or fill in what I'm missing. Thanks.