Hi All,
I read an article where an experienced builder (Sam Buchanan I think) used a pushrod instead of cables for the elevator. The pushrod appeals to me due to the greatly reduced failure points vs the cable system, BUT I keep reading that one should not deviate from the plans...... Has anyone else done the Pushrod? What size tubing should be used? Thanks!